Description:

Our team purpose the rehabilitation of a historic building of considerable architectural merit which is nowadays still useful for the educational purpose that was built. The presence of this building is reinforced by adding an extension building to complete the future needs of a primary school with new multi-purpose spaces, dressing rooms, classrooms, diningroom and new location for the children's classrooms and the nursery.

Tipology:

Public building / Restoration

Promoter:

Gisa / Infraestructuras .cat

Situation:

Artesa de Lleida

Year:

2007

Area:

1.700 m2

Description:

The project is designed according to the existing natural ground levels. Among the streets Jacint Verdaguer and Sant Ramon was a drop of 1.30 m and we start from this topographic condition to generate 2-level that show up the relation between the existing building of the old school and the future extension building, solving the proposal in its functional way.

Description:

The project focuses on a serie of key milestones based on obtaining a prismatic volume that positively affects the control of the building execution and its cost reduction. Other main keys are the separation of the existing party wall in order to ensure lighting and ventilation of the new center, and the completion of a multi-purpose room of the school thought as an agora, understanding this space as a central element of the project linking the access to the major circulations of all central buildings.

Description:

One of the particularities of the project was the rehabilitation we made on the existing school building. The school built on 1916-1918, during the Mancomunitat Prat de la Riba politic process, by the architect Francesc de Paula Morera and Gatel.

Description:

The geotechnical study concluded there was a layer of sandy Quaternary argilas with a very low mechanical strength, which in some places reached 7 meters. This forced us to make a deep foundations in the underground. We propose a structure of reinforced concrete of slab of "forel" type in order to reduce the weight of the slab. The walls were made of waterproof concrete block and steel sheet baked painted.

Description:

The landscape was a remarkable fact to define the final appearance of the project. The proposal try to identify with their context by preserving the existing trees and taking into account for the facade and the perimeter fence, the colors and of the seasonal process of the Platanus occidentalis leaf that grows up in the site.

Author:
Marc Casany / César Caicoya

Architecture:
Caio Mattei / Oriol Montfort / Pilar Peset

Structures:
Fernando Purroy

Technics:
Aribau 70 - Laia Roca

Project budget:
Marc Casany / Lluís Gutiérrez

D.O.:
Marc Casany

D.E.O.:
Ramiro Muñoz Alaman S.l.

Building company:
Garrofé y Roca, S.A.

Photograph:
Eugeni pons

Main Facade of the extension


Main view of the school from the courtyard


Main Facade of the refurbished building


Existing building designed by the architect Francesc de Paula Morera Gatell in 1913

Main entrace area
Connection between the 2 levels of the project through the ramp

Interior image
Connection area between the classrooms and the existing Primary School

Carrer de Sant Ramon 25-50, Artesa de Lleida


Main entrance facade + extensión construction limit

Original buildings

Evolution constructive stages

Ground floor
Connection between Jacint Verdaguer street and the nursey. dinningroom, courtyard and the multiuse room

First floor
Connection between Sant Ramon street - Existint Primary School and the new classrooms.

Facade
Building extension - longitudinal view

Facade
Building extension - transversal view

Facade
Refubished building

Longitudinal Section
Connection with the existing building

Longitudinal Section
Class rooms + sports center


Original section of the project


Croquis of the main facade


Image of the wood truss to be refurbished

Initial replan
First stage of the construction of the extension

Extension
Ramp construction process for the entrace to the classrooms

Structural section
Ramp view (conection of the 2 levels + multiuse room)

Construction process
Locker room on the groundfloor and classrooms and corridor on the first floor

Structural section
Connection between the locker rooms and the classrooms areas (upper level)

Main facade building process
Steel sheet baked painted - outside

Playground
CEIP + Nursery school limits

General image of the building
Entrance área + playground